The scope of work called for the drilling of six Inclinometer installations on a mining lease. A Class 1 licenced driller and accredited offsiders performed the works incident free and well ahead of estimates.
An Edson 3000 multipurpose drilling rig mounted on a 4×4 carrier was used for the drilling program supported by a Hino 4×4 water cart and Canter 4×4 crew vehicle.
Drilling method
The boreholes were drilled and stabilised utilising Rotary Mud drilling methodology. Inclinometer casing was installed and grouted into position.
All sites were finalised with headworks and concrete plinths to client specification.
The program was completed without incident, on time and on budget to deliver all stakeholders the project outcomes.