head office
253 Wattleup Road, Wattleup, WA 6166

J&S Drilling undertook a Salt Lake Auger drilling project in central West Australia drilling and sampling for Soluble Potash, a high value agricultural fertilizer, on a large salt lake.

Equipment utilised on the Salt Lake Auger drilling Project

Utilizing our all wheel terrain vehicles (ATVs) and trailer mounted drilling equipment J&S Drilling successfully drilled through the salt crust and confining clay layer to a depth of 20 metres collecting undisturbed tube samples 750mm long through Hollow Auger drilling.

Drilling Operations

Approximately 600 metres of drilling and sampling was completed during this project.

The client, listed on the ASX, was able to use the drilling sample results as part of their resource calculations for ASX reporting.