J&S Drilling completed the Monitoring Bore Drilling & Installation for Iluka Resources Capel operations in West Australia.

Monitoring Bore Drilling & Installation

Monitoring Bore were successfully drilled into the Leederville Aquifer and Superficial Aquifers by licenced Class 1 & 2 drillers along with accredited crews.

A total of 44 bores comprising 990 metres of drilling and installations were completed within the allocated timeframe handing the client cost savings on the original cost estimate.

Bore Construction

Class 12 80mm casing with 6 metre screens was installed; each bore completion included the installation of a steel lockable borehead and concrete plinth.