J&S drilling undertook the successful drilling & installation of 4 Production Bores, on behalf of the Water Corporation, within an environmentally sensitive state reserve accessed through private land.

Drilling and installations consisted of 4 large diameter Production Bores to upgrade the potable water supply for the town site of Bremer Bay.

Production Bores where drilled and installed with stainless steel screens, air developed for 40 hours and pump tested to flow rates up to 10 litres per second for 48 hours.

Water Corporations water sampling regime was completed with samples taken by J&S Drilling’s accredited water sampling team and delivered to laboratories in Perth within 24 hours.

Licenced Class 2 drillers and accredited crews completed the project on time and within budget.